| 注册
首页|期刊导航|陕西水利|榆林黄河东线马镇引水工程取水口水位流量关系曲线复核分析

榆林黄河东线马镇引水工程取水口水位流量关系曲线复核分析

慕红伟 马莅茗

陕西水利Issue(8):97-99,102,4.
陕西水利Issue(8):97-99,102,4.

榆林黄河东线马镇引水工程取水口水位流量关系曲线复核分析

Recheck Analysis of Water Level-discharge Relationship Curve of Water Intake of Mazhen Water Diversion Project in the East Line of Yulin Yellow River

慕红伟 1马莅茗1

作者信息

  • 1. 黄河勘测规划设计研究院有限公司,河南 郑州 450003||水利部黄河流域水治理与水安全重点实验室(筹),河南 郑州 450003
  • 折叠

摘要

Abstract

The relationship curve of water level and discharge at the intake of Mazhen Water Diversion Project on the eastern route of the Yellow River in Yulin directly affects the design of intake buildings,and has an important impact on the water supply guarantee rate and flood control safety.According to the six newly measured river sections at the water intake and the upstream and downstream,the water surface line is derived by using the constant non-uniform flow energy equation.By deducing the water surface line corresponding to different flow rates,the water level-flow relationship curve of the water intake section is obtained.Based on the review of the water level flow relationship curve and the measured water level flow data and the results of the feasibility study stage,a comprehensive comparative analysis can provide a more accurate and reasonable basis for the design of the water intake project.

关键词

黄河/水面线/水位流量关系曲线/取水口

Key words

Yellow River/water surface line/water level flow relationship curve/water intake

分类

天文与地球科学

引用本文复制引用

慕红伟,马莅茗..榆林黄河东线马镇引水工程取水口水位流量关系曲线复核分析[J].陕西水利,2024,(8):97-99,102,4.

陕西水利

1673-9000

访问量0
|
下载量0
段落导航相关论文