陕西水利Issue(8):149-152,4.
峡江水利枢纽大坝安全监测成果分析
Analysis of Dam Safety Monitoring Results of Xiajiang Hydro-junction
张霁云1
作者信息
- 1. 江西省峡江水利枢纽工程管理局,江西 南昌 330095
- 折叠
摘要
Abstract
The layout of monitoring facilities during the construction and management period of Xiajiang Water Conservancy Project is introduced,and the safety monitoring data of some dam bodies since 2018 are analyzed and evaluated.It is found that the historical values of some monitoring equipment fluctuate greatly.This is mainly due to the lack of timely maintenance of hub monitoring equipment.The monitoring results of each monitoring physical quantity of the dam are analyzed,and it is concluded that most of the monitoring facilities of Xiajiang Water Conservancy Project are in normal operation,and the automation system works normally.关键词
峡江水利枢纽工程/自动化系统/安全监测Key words
Xiajiang Water Conservancy Project/automation system/safety monitoring分类
建筑与水利引用本文复制引用
张霁云..峡江水利枢纽大坝安全监测成果分析[J].陕西水利,2024,(8):149-152,4.