软岩筑坝料在芝瑞抽水蓄能电站中的应用

耿江博 李伟 韩华强 尤恒 崔笑 魏向诚 赵署光

水力发电2024,Vol.50Issue(8):38-43,6.
水力发电2024,Vol.50Issue(8):38-43,6.

软岩筑坝料在芝瑞抽水蓄能电站中的应用

Application of Soft Rock Dam Materials in Zhirui Pumped-storage Power Station

耿江博 1李伟 2韩华强 3尤恒 1崔笑 2魏向诚 1赵署光1

作者信息

  • 1. 内蒙古赤峰抽水蓄能有限公司,内蒙古 赤峰 025350
  • 2. 中国电建集团北京勘测设计研究院有限公司,北京 100024
  • 3. 南京水利科学研究院,江苏 南京 210024
  • 折叠

摘要

Abstract

According to the characteristics of soft rock materials in the excavation materials of the upper reservoir basin of Zhirui Pumped-storage Power Station,the application of soft rock dam materials in the upper reservoir of Zhirui Pumped-storage Power Station is explored combined with the study of filling design parameters,indoor mechanical tests and dam slope stability analysis.The results of stability calculation show that,(a)it is feasible for the upper reservoir dam of Zhirui Pumped-storage Power Station to adopt 70% stomatal basalt+30% tuffaceous breccia in the rockfill Zone 2 and to use the excavated tuffaceous breccia material as the filling material in the rockfill Zone 3;and(b)it is suitable to adopt the slope ratio of 1∶2.0 for the downstream dam slope above 1550 m elevation and the 15 m-width rockfill Zone 2 to protect the rockfill Zone 3,and to control the compaction degree of 0.98 by heavy compaction in the rockfill Zone 2 and Zone 3,that can sufficiently guarantee the stability and safety of the dam.

关键词

软岩/填筑标准/三轴试验/稳定分析/抽水蓄能电站

Key words

soft rock/filling standard/three-axis test/stability analysis/pumped-storage power station

分类

建筑与水利

引用本文复制引用

耿江博,李伟,韩华强,尤恒,崔笑,魏向诚,赵署光..软岩筑坝料在芝瑞抽水蓄能电站中的应用[J].水力发电,2024,50(8):38-43,6.

基金项目

国网新源公司科技项目资助项目(SGXYKJ-2022-104) (SGXYKJ-2022-104)

水力发电

OACSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文