水利水电技术(中英文)2024,Vol.55Issue(6):172-181,10.DOI:10.13928/j.cnki.wrahe.2024.06.014
不同影像处理方法在大坝施工范围识别中的应用分析
Application analysis of different image processing methods in the identification of dam construction areas
摘要
Abstract
[Objective]The recognition of construction area is a fundamental aspect of refined management during dam construc-tion.Traditional method of recognizing construction area mainly involve manual interpretation,which is inefficient,costly and subjective.Applying new intelligent image interpretation method to recognize dam construction areas is a challenging technology problem.[Methods]In this study,focused on the characteristics of large and continuous area,complex terrain,and high degree of human interference associated with dam construction areas,we selected high-resolution imagery from GF-2 and Sentinel-2 sat-ellites to investigate the application effects of different remote sensing image interpretation method in automatic recognition of dam construction areas,using Fengshan Reservoir in Guizhou Province,China,as the research area.[Results]The three method used in this paper have good result and have different advantages.[Conclusion]The result indicate that the image segmentation,change detection,and intelligent classification method can achieve better recognition result for dam construction areas.Among them,the second method is the optimal approach and does not require manual intervention,while the first method is susceptible to the selection of threshold values and superimposed analysis,and has lower recognition accuracy than the latter two method,but the processing flow is simple and easy to implement.关键词
施工范围/影像解译/自动识别/遥感监测/水利工程/影响因素Key words
construction area/image interpretation/automatic recognition/remote sensing monitoring/water conservancy pro-ject/influence factors分类
信息技术与安全科学引用本文复制引用
赵琳,许健,奚歌,索靖,谢津平..不同影像处理方法在大坝施工范围识别中的应用分析[J].水利水电技术(中英文),2024,55(6):172-181,10.基金项目
国家重点研发计划课题(2021YFB3900603) (2021YFB3900603)