摘要
Abstract
According to the design calculation method of flue reinforcement rib,two calculation methods based on the design code of flue gas pulverized coal duct of thermal power plant and finite element force analysis are introduced,and the economy of the design selection of reinforcement rib is further discussed in a practical project.We carried out a comparison between the design of flue gas duct flue design code and finite element force analysis based on the setting of reinforcement ribs of flue gas duct of a unit in the project.关键词
烟风道/加固肋/烟风煤粉管道设计规范/有限元受力分析Key words
flue gas duct/reinforcement rib/flue gas pulverized coal duct design code/finite element stress analysis分类
机械制造