市政技术2024,Vol.42Issue(8):271-275,5.DOI:10.19922/j.1009-7767.2024.08.271
北京市公路修复性养护工程企业管理费计取的思考与建议
Thoughts and Suggestions on the Calculation of Management Fees of Enterprises in Beijing Highway Repair and Maintenance Projects
李建国1
作者信息
- 1. 北京市交通基础设施建设项目管理中心,北京 100060
- 折叠
摘要
Abstract
According to JTG 3830-2018 Method for budget preparation of highway engineering construction pro-jects,Beijing highway repair and maintenance project prepare a preliminary budget document.The enterprise man-agement fee rates were compared with those of highway construction projects and urban road maintenance projects,and it was found that the enterprise management fee rates of highway repair and maintenance projects were relatively lower.According to JTG 3830-2018 Method for budget preparation of highway engineering construction projects,measurement fees and enterprise management fees are not included for finished and semi-finished materials.As the proportion of finished and semi-finished materials in highway construction projects is smaller with relatively smaller impact on project costs;However,the finished and semi-finished materials of respair maintenance projects account for more than 85%of the total material value with a relatively high proportion.If enterprise management fees are not included,it will have a significant impact on the project cost.In addition,enterprise management costs do occur during the construction.Therefore,it is recommended to appropriately calculate the actual enterprise management costs in the preparation of the preliminary budget document for restorative maintenance projects.关键词
公路/修复性养护工程/企业管理费费率Key words
highway/repair & maintenance engineering/enterprise management rate分类
管理科学引用本文复制引用
李建国..北京市公路修复性养护工程企业管理费计取的思考与建议[J].市政技术,2024,42(8):271-275,5.