铁道运输与经济2024,Vol.46Issue(7):211-218,8.DOI:10.16668/j.cnki.issn.1003-1421.2024.07.24
雅万高速铁路联调联试技术方案研究
Research on Technical Scheme of the Integrated Commissioning&Test of Jakarta-Bandung High Speed Railway
摘要
Abstract
Jakarta-Bandung High Speed Railway is China's first high speed railway project launched overseas with all systems,all elements and all industrial chains.In order to achieve the successful adoption of integrated commissioning&test standard for China's high speed railway on the Jakarta-Bandung High Speed Railway and ensure the smooth implementation of integrated commissioning&test,this paper studied the test standards for Jakarta-Bandung High speed Railway,which involved the adaptability of measurement points selected such as track,turnout,roadbed.etc.,and the adaptability of value limit on vibration,noise,traction power supply,and gave suggestions on the adaptability of these standards.Based on the geographical environment,equipment&facilities and on-site organization division of the Jakarta-Bandung High Speed Railway,this paper analyzed the problems and technical challenges that may be encountered in the integrated commissioning and test,and put forward the technical scheme for the selection of the standards and their on-site implementation,which provides technical support for Jakarta-Bandung High Speed Railway opening and operation.关键词
雅万高速铁路/联调联试/技术标准/适应性分析/技术方案Key words
Jakarta-Bandung High Speed Railway/Integrated Commissioning&Test/Technical Standard/Adaptability Analysis/Technical Scheme分类
交通工程引用本文复制引用
李林灿..雅万高速铁路联调联试技术方案研究[J].铁道运输与经济,2024,46(7):211-218,8.基金项目
中国铁道科学研究院集团有限公司科研项目(2022YJ181) (2022YJ181)