铜业工程Issue(3):54-60,7.DOI:10.3969/j.issn.1009-3842.2024.03.005
提高大红山铜矿铜回收率及降低介耗的研究
Research on Industrialization Optimization of Grinding System in Dahongshan Copper Mine
摘要
Abstract
In order to solve the problems of low content of qualified particle size,high content of over-ground product in first grinding stage,and low copper recovery in the No.1 beneficiation plant,Dahongshan copper mine,Yuxi Mining Co.,LTD.The optimal ratio of steel ball in the mill was derived on the properties of feed,the semi-theoretical formula of ball diameter and the principle of accurate make-up ball,and the laboratory tests and industrial tests were carried out.The initial loading scheme of steel balls as m(Φ70)︰m(Φ 50)︰m(Φ40)︰m(Φ30)=15︰25︰35︰25 was deduced according to the above parameters,and the results of both the laboratory tests and industrial tests shown that this scheme can increase the content of-0.020+0.010 mm selectable particle size and-0.074+0.018 mm easily selectable particle size,meanwhile the phenomenon of overgrinding was effectively reduced.In addition,the research can re-duce the media loss,improve the recovery rate of copper concentrate and realize the destination of cost reduction and efficiency increas-ing.关键词
大红山铜矿/回收率/磨矿/钢球/介耗Key words
Dahongshan copper mine/recovery rate/ore grinding/steel ball/media loss分类
矿业与冶金引用本文复制引用
肖庆飞,王国彬,金赛珍,骆忠,田厚源,周强,刘向阳,朱有军,龚学东..提高大红山铜矿铜回收率及降低介耗的研究[J].铜业工程,2024,(3):54-60,7.基金项目
国家自然科学基金项目(52374269) (52374269)
矿物加工科学与技术国家重点实验室开放基金项目(BGRIMM-KJSKL-2023-09)资助 (BGRIMM-KJSKL-2023-09)