NCRPE约束下具有周期性禁止时间窗口的项目群业主费用优化模型

聂蕊琪 丰慧 张焱 李明

系统管理学报2024,Vol.33Issue(4):943-958,16.
系统管理学报2024,Vol.33Issue(4):943-958,16.DOI:10.3969/j.issn2097-4558.2024.04.008

NCRPE约束下具有周期性禁止时间窗口的项目群业主费用优化模型

Optimization Model of Program Employer's Cost with Periodic Forbidden Time Window Under the Constraint of NCRPE

聂蕊琪 1丰慧 2张焱 2李明3

作者信息

  • 1. 河海大学商学院,南京 211100
  • 2. 南京工程学院经济与管理学院,南京 211167
  • 3. 河海大学商学院,南京 211100||江苏省"世界水谷"与水生态文明协同创新中心,南京 211100
  • 折叠

摘要

Abstract

The contracted project with a periodicity forbidden time window(special contracted project for short)is the key to affect the implementation effect of the program.How to effectively control the progress of the contracted project with periodicity forbidden time window is not only a theoretical problem,but also a practical problem.First,the problem is defined,the principle of employer cost optimization of program is analyzed in detail,and the special contracted projects are divided into two categories:contracted projects that can be completed within the original time window and contracted projects that can be completed in the next time window.Then,considering the particularity of the contract project with a periodic prohibition time window,an optimization model of the program owner's cost before and during the implementation of the program are constructed.Afterwards,a case study was conducted in combination with program R to verify the feasibility and effectiveness of the model.Finally,the management enlightenment is proposed.The research results show that in the program with a periodic forbidden time window,the degree of adverse impact of contracted project delay on the program depends not only on the degree of adverse impact on general contracted projects,but also on whether special contracted projects can be completed within the original planned time window.To this end,the employer should improve the probability of completing the special contracted project within the original time window by arranging the start time of the program and the special contract,so as to significantly reduce the cost of the program employer.

关键词

项目群/甲供非商品化资源/禁止时间窗口/模型/周期性

Key words

program/non-commercial resources provided by employer/forbidden time window/model/periodicity

分类

建筑与水利

引用本文复制引用

聂蕊琪,丰慧,张焱,李明..NCRPE约束下具有周期性禁止时间窗口的项目群业主费用优化模型[J].系统管理学报,2024,33(4):943-958,16.

基金项目

国家社会科学基金资助项目(17BGL156) (17BGL156)

河海大学中央高校基本科研业务费项目(B220207039) (B220207039)

住房和城乡建设部2018年科学技术项目计划(2018-K8-023) (2018-K8-023)

南京市建设行业科技计划项目(K2213) (K2213)

系统管理学报

OA北大核心CSSCICSTPCD

2097-4558

访问量0
|
下载量0
段落导航相关论文