云南冶金2024,Vol.53Issue(3):41-47,7.
大直径深孔嗣后充填法不稳固顶板支护方案研究
Retaining and Protecting Scheme Research on Unstable Roof by Using of Major Diameter Long-hole Subsequent Filling Method
李凡 1罗正良 1龙赣2
作者信息
- 1. 保山金厂河矿业有限公司,云南保山6780001
- 2. 昆明理工大学国土资源工程学院,云南昆明 650093
- 折叠
摘要
Abstract
The roof-cutting roadside support of the stope is the important and difficult point of the large diameter subsequent filling mining method,the support scheme seems to be very important,the roof support scheme is proposed for the large diameter long-hole lateral caving subsequent filling method,we overall analyzed the unstable factors of roof-cutting roadside support,and proposed the arrangement of pillars on both sides of roof cutting,as well as the arrangement of prestressed anchor-anchor cable method,the monitored volume of movement of the roof area is only 5.97 mm,then the roof stability is increased greatly,it can provide references of the roof support scheme of the mining area to similar mines.关键词
大直径深孔嗣后充填采矿法/不稳固顶板/支护方案/理论分析Key words
large diameter subsequent filling mining method/unstable roof/support scheme/theroretical analysis分类
矿业与冶金引用本文复制引用
李凡,罗正良,龙赣..大直径深孔嗣后充填法不稳固顶板支护方案研究[J].云南冶金,2024,53(3):41-47,7.