中国标准化Issue(15):148-152,5.DOI:10.3969/j.issn.1002-5944.2024.015.019
NB/T 35009-2024修订内容解读及抽水蓄能电站标准化工作历程回顾
Interpretation of Revisions of NB/T 35009-2024 and Review of Standardization for Pumped Storage Power Stations
摘要
Abstract
This paper reviews the standardization process of site selection planning for pumped storage power stations.The working scope of site selection planning gradually expanded in the 1990s.With the launching of a batch of representative stations,the idea of site selection planning gradually matured.the first edition of NB/T 35009 was developed in 2003.China carried out national site selection planning for pumped storage power stations in 2009,and 22 provinces completed the site selection work.The second edition of the standard was revised,which effectively guided the practical work.With the development of process management and technical route of site selection planning for pumped storage power stations,site selection planning has become an important basis for preliminary work and construction.Since the goals of carbon peak and neutrality were proposed,the medium-and long-term development plan for pumped storage has brought new opportunities and challenges to the industrial development.The third revision of the standard has been timely carried out to distinguish function,clarify technical requirements,and actively respond to the current demands of the high-quality industrial development of new energy and pumped power storage.关键词
抽水蓄能电站选点规划/抽水蓄能发展规划/抽水蓄能电站技术标准体系Key words
site selection planning for pumped storage power stations/development planning for pumped storage power industry/standards system for pumped storage power station technology引用本文复制引用
高洁,岳蕾,朱方亮..NB/T 35009-2024修订内容解读及抽水蓄能电站标准化工作历程回顾[J].中国标准化,2024,(15):148-152,5.基金项目
本文受国家自然科学基金项目"黄河上游水资源演变对水光风储多能互补影响"(项目编号:U2243232)、中国电建集团科技项目"流域梯级‘水风光储'一体化关键技术"(项目编号:DJ-HXGG-2022-01)、水电水利规划设计总院有限公司科技项目"可再生能源参与电力市场竞价模式研究"(项目编号:ZXKJGH-20220003)资助. (项目编号:U2243232)