中国防汛抗旱2024,Vol.34Issue(7):6-9,41,5.DOI:10.16867/j.issn.1673-9264.2024190
四川省山洪灾害防治项目实施方案设计探讨
Discussion on the implementation plan of mountain flood disaster prevention and control project in Sichuan Province
摘要
Abstract
Sichuan Province has become one of the provinces with the highest number of flash floods due to its unique terrain,geological conditions,and geographical location.Flash floods are highly destructive and pose a serious threat to people's lives and property safety.Based on the causes and characteristics of mountain flood disasters in Sichuan Province,propose a governance plan that combines non-structural measures with key mountain gullies.On the basis of conventional non-structural measures,a dynamic and graded management list of hazard areas is established.At the same time,combined with dynamic warning indicator analysis,provincial-level mountain flood risk prediction and warning services and warning information release are carried out.Combined with the management of key mountain gullies,a mountain flood prevention and control system suitable for the characteristics of Sichuan Province is created.关键词
山洪灾害/非工程措施/危险区动态和分级管理/动态预警指标/四川省Key words
flash flood/non-structural measures/dynamic and graded management in hazard areas/dynamic warning indicator/Sichuan Province分类
建筑与水利引用本文复制引用
李萍,黄尔,杨涛..四川省山洪灾害防治项目实施方案设计探讨[J].中国防汛抗旱,2024,34(7):6-9,41,5.基金项目
第二次青藏高原综合科学考察研究项目(2019QZKK020401). (2019QZKK020401)