| 注册
首页|期刊导航|河南水利与南水北调|某污水处理厂水土保持措施

某污水处理厂水土保持措施

张华

河南水利与南水北调2024,Vol.53Issue(7):16-17,2.
河南水利与南水北调2024,Vol.53Issue(7):16-17,2.

某污水处理厂水土保持措施

Soil and Water Conservation Measures for a Waste Water Treatment Plant

张华1

作者信息

  • 1. 开封市汴龙勘察设计有限公司,河南 开封 475000
  • 折叠

摘要

Abstract

Based on the principle of"prevention first,protection priority,and combination of prevention and control",this paper analyzes and evaluates the measures with soil and water conservation functions in the design of the main project.Aiming at the soil erosion caused by the construction of a waste water treatment plant and its degree of harm,combined with the experience of soil and water conservation of similar projects,the soil and water conservation engineering measures,plant measures,permanent measures and temporary measures,soil and water conservation measures designed by the main body and new measures of the program are organically combined.Soil and water conservation measures shall be laid in a comprehensive,scientific and systematic manner according to local conditions in accordance with the control zones,and a complete system of comprehensive control measures shall be formed.

关键词

水土保持/措施/布设

Key words

soil and water conservation/measure/layout

分类

农业科技

引用本文复制引用

张华..某污水处理厂水土保持措施[J].河南水利与南水北调,2024,53(7):16-17,2.

河南水利与南水北调

1673-8853

访问量0
|
下载量0
段落导航相关论文