| 注册
首页|期刊导航|科技创新与应用|特大桥桥塔施工重难点及应对措施

特大桥桥塔施工重难点及应对措施

杨世鸿

科技创新与应用2024,Vol.14Issue(25):157-159,164,4.
科技创新与应用2024,Vol.14Issue(25):157-159,164,4.DOI:10.19981/j.CN23-1581/G3.2024.25.039

特大桥桥塔施工重难点及应对措施

杨世鸿1

作者信息

  • 1. 北京铁城工程咨询有限公司,北京 100043
  • 折叠

摘要

Abstract

Taking the construction of the main bridge tower of an extra-large river-crossing bridge as an example,this paper adopts closed hydraulic climbing form for the main tower,support method and bracket method for upper and lower crossbeams,stage pouring of tower column and so on from the point of view of key difficulties and safety in construction.Its construction technology is complex,overcoming many important and difficult influences and comprehensive coverage.Through the summary and exposition of the key technologies of the main tower construction,the concrete technology and process of the main tower construction are introduced in detail.The purpose of this paper is to provide reference for the optimal design of similar projects.

关键词

桥梁工程/主塔/液压爬模/关键技术/施工工艺

Key words

bridge engineering/main tower/hydraulic climbing form/key technology/construction technology

分类

交通工程

引用本文复制引用

杨世鸿..特大桥桥塔施工重难点及应对措施[J].科技创新与应用,2024,14(25):157-159,164,4.

科技创新与应用

2095-2945

访问量0
|
下载量0
段落导航相关论文