铁道货运2024,Vol.42Issue(8):21-27,7.DOI:10.16669/j.cnki.issn.1004-2024.2024.08.04
浩吉铁路集疏运能力适配性分析及对策研究
Adaptability Analysis of Collection and Distribution Capacity of Haolebaoji-Ji'an Railway and Its Countermeasures
摘要
Abstract
The lagged development of Haolebaoji-Ji'an Railway collection and distribution capacity limits its further freight increment,failing to meet the demand for coal dispatching in Hubei,Hunan,and Jiangxi provinces.Completing the construction of Haolebaoji-Ji'an Railway collection and distribution system significantly promotes the expeditious release of the capacity of Haolebaoji-Ji'an Railway,adapting itself to the changes in the production,transportation,and marketing patterns of coals in China.By analyzing the current system and the origin of freight increment in the future,this paper had an insight into the problems in the system construction.On this basis,a series of countermeasures were put forward to enhance its market competitiveness,such as coordinating the development of collection and distribution capacity with freight increment,optimizing the timing of construction,establishing a coordination platform,and deepening research on freight rates.The results can provide a reference for accelerating the construction of the collection and distribution system,relieving capacity constraints,and achieving the goal of freight increment.关键词
浩吉铁路/集疏运能力/煤炭调运/货运增量/市场竞争力Key words
Haolebaoji-Ji'an Railway/Collection and Distribution Capacity/Coal Dispatching/Freight Increment/Market Competitiveness分类
交通工程引用本文复制引用
徐雪艺,杨成宏..浩吉铁路集疏运能力适配性分析及对策研究[J].铁道货运,2024,42(8):21-27,7.基金项目
中国国家铁路集团有限公司科技研究开发计划课题(N2023X018,K2022X024) (N2023X018,K2022X024)