云南水力发电2024,Vol.40Issue(8):8-13,6.DOI:10.3969/j.issn.1006-3951.2024.08.003
2×660 MW机组煤电一体化工程水资源论证分析
Analysis of Water Resources Demonstration for 2×660 MW Unit Coal Electricity Integration Project
孔帆 1苏柳 2高涛2
作者信息
- 1. 河南省万氢能源有限公司,河南 郑州 450003
- 2. 黄河勘测规划设计研究院有限公司,河南 郑州 450003
- 折叠
摘要
Abstract
At present,in the construction of coal circuit integration projects and large-scale air-cooled units,the national requirements for the water source configuration plan of the projects include compliance with local water resource conditions,water resource planning and management,and other aspects.This article takes a 2×660MW coal-fired power integration project as an example to conduct in-depth research on water resources demonstration.It conducted a special analysis on the rationality of water intake and hydration in the project and concluded that the water intake plan and water source of the project are reliable,the water withdrawal plan of the project is feasible,and measures to reduce the impact of water intake and withdrawal are provided.The implementation of the water resources demonstration work in this project is of great significance for the planning,management,protection of water resources,and the safe production of construction projects.关键词
水资源论证/建设项目/取用水合理性/退水影响/节水Key words
water resource assessment/construction project/use hydration rationality/impact of water withdrawal/water conservation分类
水利科学引用本文复制引用
孔帆,苏柳,高涛..2×660 MW机组煤电一体化工程水资源论证分析[J].云南水力发电,2024,40(8):8-13,6.