| 注册
首页|期刊导航|云南水力发电|取水泵房进水道定型模板施工工艺

取水泵房进水道定型模板施工工艺

陈彬

云南水力发电2024,Vol.40Issue(8):123-125,148,4.
云南水力发电2024,Vol.40Issue(8):123-125,148,4.DOI:10.3969/j.issn.1006-3951.2024.08.029

取水泵房进水道定型模板施工工艺

Construction Process of Standardized Formwork for Inlet Channel of Water Intake Pump Room

陈彬1

作者信息

  • 1. 内江职业技术学院,四川 内江 641000
  • 折叠

摘要

Abstract

The inlet channel is located at the forefront of the intake pump room,and as an important component of the intake pump room,its construction quality assurance is particularly important.A specialized fixed wooden formwork is used as the formwork support for the inlet channel,assembled in layers and blocks with high installation accuracy.The dismantling and reuse are relatively smooth,ensuring the quality of concrete pouring for the inlet channel.

关键词

泵房/进水道/定型模板/装配式组装

Key words

pump room/inlet waterway/standardized template/prefabricated assembly

分类

水利科学

引用本文复制引用

陈彬..取水泵房进水道定型模板施工工艺[J].云南水力发电,2024,40(8):123-125,148,4.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文