Abstract
The inlet channel is located at the forefront of the intake pump room,and as an important component of the intake pump room,its construction quality assurance is particularly important.A specialized fixed wooden formwork is used as the formwork support for the inlet channel,assembled in layers and blocks with high installation accuracy.The dismantling and reuse are relatively smooth,ensuring the quality of concrete pouring for the inlet channel.关键词
泵房/进水道/定型模板/装配式组装Key words
pump room/inlet waterway/standardized template/prefabricated assembly分类
水利科学引用本文复制引用