云南水力发电2024,Vol.40Issue(8):144-148,5.DOI:10.3969/j.issn.1006-3951.2024.08.035
低水头大流量混流式水轮机顶盖振动研究
Research on the Vibration of the Top Cover of a Low Head High Flow Mixed Flow Turbine
郭金忠 1李华1
作者信息
- 1. 华能澜沧江水电股份有限公司景洪水电厂,云南 西双版纳 666100
- 折叠
摘要
Abstract
To solve the stability problem of low head and high flow mixed flow water turbines,Jinghong Power Station has taken measures such as throttling of the top cover pressure relief pipe,forced air supply to the top cover,and optimization of the start-up rules of the governor,based on existing conditions.This paper mainly elaborates on the influence of top cover pressure relief throttling,top cover forced air supply,and governor start-up rules on the stability of water turbine operation.关键词
水轮机/顶盖/振动/泄压/补气/开机规律Key words
water turbine/cover/vibration/pressure relief/air supply/startup rule分类
建筑与水利引用本文复制引用