基于乌江梯级水库年初低蓄能的调度运行安排

田叶 郑维军

云南水力发电2024,Vol.40Issue(8):206-209,221,5.
云南水力发电2024,Vol.40Issue(8):206-209,221,5.DOI:10.3969/j.issn.1006-3951.2024.08.052

基于乌江梯级水库年初低蓄能的调度运行安排

Scheduling and Operation Arrangement Based on Low Energy Storage of Wujiang Cascade Reservoirs at the Beginning of the Year

田叶 1郑维军2

作者信息

  • 1. 贵州乌江水电开发有限责任公司水电站远程集控中心,贵州 贵阳 550002
  • 2. 华电电力科学研究院有限公司,浙江 杭州 310000
  • 折叠

摘要

Abstract

In order to make rational use of hydropower resources in the basin and improve the economic benefits of cascade hydropower,Wujiang Central Control has always focused on optimizing hydropower scheduling.In practice,it has gradually created annual operation mode suggestions,monthly operation mode suggestions,weekly operation mode suggestions,and daily operation scheduling intention control forms.By predicting the inflow situation of the watershed and combining it with the actual equipment situation of each cascade power station and the electricity demand of the power grid,different scheduling and operation modes have been formulated to achieve the optimal operation of the Wujiang cascade during flood and non flood seasons.Due to the low energy storage of Wujiang Cascade Reservoir at the beginning of the year,a brief discussion was made on the scheduling and operation arrangements of Wujiang Cascade during the non flood season at the beginning of the year.

关键词

乌江梯级/低蓄能/调度意图控制单/运行方式

Key words

Wujiang Cascade/low energy storage/scheduling intent control form/operation mode