| 注册
首页|期刊导航|岩土工程学报|钢管锚锭板桩全回收基坑支护技术及模型试验研究

钢管锚锭板桩全回收基坑支护技术及模型试验研究

李鹏 刘强 杨俊杰 吴刚

岩土工程学报2024,Vol.46Issue(z1):228-232,5.
岩土工程学报2024,Vol.46Issue(z1):228-232,5.DOI:10.11779/CJGE2024S10045

钢管锚锭板桩全回收基坑支护技术及模型试验研究

Fully recoverable retaining technology of sheet piles anchored by steel pipe piles for excavations and model tests

李鹏 1刘强 2杨俊杰 3吴刚4

作者信息

  • 1. 青岛市勘察测绘研究院,山东 青岛 266032||中国海洋大学 环境科学与工程学院,山东 青岛 266100||青岛市智慧(绿色)岩土技术创新中心,山东 青岛 266032
  • 2. 山东科技大学地球科学与工程学院,山东 青岛 266590
  • 3. 中国海洋大学 环境科学与工程学院,山东 青岛 266100||中国海洋大学海洋环境与生态教育部重点实验室,山东 青岛 266100
  • 4. 青岛市勘察测绘研究院,山东 青岛 266032||青岛市智慧(绿色)岩土技术创新中心,山东 青岛 266032
  • 折叠

摘要

Abstract

In light of the issues such as inefficiency of retaining component utilization,environmental contamination and excessive carbon emissions associated with excavation engineering,a fully recoverable retaining technology of sheet piles anchored by steel pipe piles is proposed for excavations,and the composition of the retaining system is introduced.A large-scale scale model test is conducted,and the displacements of the sheet piles and pipe piles during excavation are quantitatively measured using the photogrammetry such as DIC and DPA.The test results indicate that the anchorage action of the pipe piles imposes a significant constraint on the structural displacement,and the displacement can be effectively mitigated by increasing the number of pipe piles per unit width.The displacement at the top of the pipe pile exhibits a hyperbolic relationship with the excavation depth.The deformation and failure mechanism of the model foundation are associated with the distance between the pipe piles and the sheet piles.As the distance increases,the failure mechanism varies from the concurrent inclination of the pipe piles and sheet piles to the slippage along the pipe piles,and subsequently to the slippage along the surface area extending about 1.5 times the excavation depth from the sheet piles.The deformations at the top of both the pipe piles and the sheet pile remain consistent throughout the excavation process.

关键词

钢管锚锭板桩/全回收/基坑支护技术/模型试验

Key words

sheet pile anchored by steel pipe pile/full recovery/retaining technology for excavation/model test

分类

建筑与水利

引用本文复制引用

李鹏,刘强,杨俊杰,吴刚..钢管锚锭板桩全回收基坑支护技术及模型试验研究[J].岩土工程学报,2024,46(z1):228-232,5.

基金项目

国家自然科学基金面上项目(52078474,51779235,52378380) (52078474,51779235,52378380)