福建冶金2024,Vol.53Issue(5):17-20,4.
1000 m3级高炉停炉实践
Shutdown Practice of 1000m3 Blast Furnace
陈海龙1
作者信息
- 1. 福建三钢闽光股份有限公司,福建三明 365000
- 折叠
摘要
Abstract
This paper summarizes the shutdown of 1050 m3 blast furnace by water injection with empty charge line.Before shutting down the furnace,we made full preparation,and strictly monitored the parameters in the process of stopping the furnace,so as to ensure the complete recovery of the gas,and no knock occurred in the whole process,so that the residual slag iron in the furnace can be smoothly and safely discharged,so as to meet the basic needs of safety,environmental protection and smooth shutdown.关键词
零爆震/空料线打水/停炉Key words
zero detonation/drawing water from empty material line/shutdown引用本文复制引用
陈海龙..1000 m3级高炉停炉实践[J].福建冶金,2024,53(5):17-20,4.