| 注册
首页|期刊导航|水力发电学报|考虑降雨-洪水-泥沙作用下的淤地坝溃决致灾风险评估

考虑降雨-洪水-泥沙作用下的淤地坝溃决致灾风险评估

王琳 褚珍雄 薛一峰 何小亮 黎静

水力发电学报2024,Vol.43Issue(8):32-45,14.
水力发电学报2024,Vol.43Issue(8):32-45,14.DOI:10.11660/slfdxb.20240804

考虑降雨-洪水-泥沙作用下的淤地坝溃决致灾风险评估

Risk assessment of check dam breaching caused by rainfall-flooding-sedimentation interaction

王琳 1褚珍雄 1薛一峰 2何小亮 3黎静3

作者信息

  • 1. 西安理工大学 省部共建西北旱区生态水利国家重点实验室,西安 710048
  • 2. 陕西省水利电力勘测设计研究院 水电工程分院,西安 710001
  • 3. 中国电建集团西北勘测设计研究院有限公司,西安 710065
  • 折叠

摘要

Abstract

Once encountering extreme rainfall,a check dam is highly prone to flooding and collapse,posing a grave threat to downstream communities;a quantitative risk assessment of dam failure caused by its breaching is urgent.Previous studies overlooked the impact of sedimentation on dam failure.In this paper,we examine the influence of rainfall-induced sedimentation on the failure and reveal a mechanism of the dam behavior under the interaction of rainfall,flooding,and sedimentation.We then develop a mathematical model for quantitative assessment of dam failure risks,extending traditional"rainfall-flooding"modeling to"rainfall-flooding-sedimentation"so as to achieve more accurate assessment of dam failure and its risks.We have applied this model in two failure cases of the Wangmaogou watershed and assessed their risks under different return periods of rainfall.Results indicate that the impact of sedimentation is a significant factor.For the Guandigou 3rd dam,Beitagou dam,and Kanghegou 3rd dam,the judgement and calculation results agree with all the three real failure cases when using the simulation considering the sedimentation factor,while they deviate from the reality of the Beitagou dam failure when neglecting this factor.Detailed comparison indicates that under the rainfall on July 26,2017,neglecting the sedimentation role advances the failure initiation time of the three dams as listed above by 11 minutes,13 minutes,and 7 minutes respectively.This facilitates timely issuing of the warnings of emergency and quick evacuation of the people living around the dam,and enhances the accuracy of check dam warnings.For the Guandigou 3rd dam under the rainfalls of different return periods,its failure discharge is 4.82 m3/s and 5.97 m3/s under 10-year and 200-year periods respectively.The other two dams can withstand a 200-year return period rainfall under current siltation conditions.

关键词

淤地坝/降雨-洪水-泥沙/溃决致灾/风险评估/灾害预警

Key words

check dam/rainfall-flooding-sedimentation/dam breach hazard/risk assessment/disaster warning

分类

水利科学

引用本文复制引用

王琳,褚珍雄,薛一峰,何小亮,黎静..考虑降雨-洪水-泥沙作用下的淤地坝溃决致灾风险评估[J].水力发电学报,2024,43(8):32-45,14.

基金项目

国家自然科学基金项目(52279111 ()

51909214) ()

水力发电学报

OA北大核心CSTPCD

1003-1243

访问量0
|
下载量0
段落导航相关论文