高比例风电并网系统线路过载问题研究

陈宇 王震泉 甄宏宁

电力勘测设计Issue(z1):9-13,5.
电力勘测设计Issue(z1):9-13,5.DOI:10.13500/j.dlkcsj.issn1671-9913.2024.S1.002

高比例风电并网系统线路过载问题研究

Research on Line Overload Problem of High Proportion Wind Power Grid-Connected System

陈宇 1王震泉 1甄宏宁1

作者信息

  • 1. 中国能源建设集团江苏省电力设计院有限公司,江苏 南京 211100
  • 折叠

摘要

Abstract

Renewable energy connecting to the grid increases the uncertainty of power system.In order to realize the risk assessment of power system,a novel method of line overload safety risk assessment under typical operating scenarios for wind power grid-connected system is proposed in this paper.Firstly,K-means algorithm is used to construct typical system scenarios.Furthermore,the risk indicator of line overload is evaluated combined with risk theory,which characterizes the fluctuation of the line power flow and the change of the system state.Finally,a simulation is carried out to calculate the risk indicators under typical scenarios.The results show that the changes in typical system scenarios directly affect the operation of power system and risk indicators.Among them,in scenarios where the wind power level is higher and the load level is lower,the risk indicators are higher.

关键词

风电场/线路过载/风险评估/场景聚类

Key words

wind farm/line overload/risk assessment/scenario clustering

分类

能源与动力

引用本文复制引用

陈宇,王震泉,甄宏宁..高比例风电并网系统线路过载问题研究[J].电力勘测设计,2024,(z1):9-13,5.