摘要

Abstract

During the construction of the Taklade oil and gas service terminal project in Ghana,the square prefabricated construction technology of the gravity square terminal was successfully applied according to the climatic conditions in West Africa.It particularly solves the construction quality problem of concrete block prefabrication under high temperature and humidity conditions,and provides valuable experience for the construction of gravity-type block piers under similar climate conditions.This case provides a reliable reference and guidance on how to effectively construct concrete block precast gravity block piers in tropical climates.

关键词

方块码头/方块预制/混凝土降温

Key words

gravity block quay wall/concrete block prefabricat/concrete temperature control