港口航道与近海工程2024,Vol.61Issue(z1):37-40,4.DOI:10.16403/j.cnki.ggjs2024S109
特殊气候条件下重力式码头方块预制施工技术
Application of gravity wharf block prefabrication technology under special climate conditions in West Africa
邢启超 1曾思宁 1孙世海1
作者信息
- 1. 中交一航局第五工程有限公司,河北秦皇岛 066000
- 折叠
摘要
Abstract
During the construction of the Taklade oil and gas service terminal project in Ghana,the square prefabricated construction technology of the gravity square terminal was successfully applied according to the climatic conditions in West Africa.It particularly solves the construction quality problem of concrete block prefabrication under high temperature and humidity conditions,and provides valuable experience for the construction of gravity-type block piers under similar climate conditions.This case provides a reliable reference and guidance on how to effectively construct concrete block precast gravity block piers in tropical climates.关键词
方块码头/方块预制/混凝土降温Key words
gravity block quay wall/concrete block prefabricat/concrete temperature control分类
建筑与水利引用本文复制引用
邢启超,曾思宁,孙世海..特殊气候条件下重力式码头方块预制施工技术[J].港口航道与近海工程,2024,61(z1):37-40,4.