| 注册
首页|期刊导航|港口航道与近海工程|钢管板组合桩结构特点及施工工艺

钢管板组合桩结构特点及施工工艺

陈奇

港口航道与近海工程2024,Vol.61Issue(z1):50-53,4.
港口航道与近海工程2024,Vol.61Issue(z1):50-53,4.DOI:10.16403/j.cnki.ggjs2024S112

钢管板组合桩结构特点及施工工艺

Structural characteristics and driving procedures for steel tube-sheet composite piles

陈奇1

作者信息

  • 1. 中交一航局第五工程有限公司,河北秦皇岛 066000
  • 折叠

摘要

Abstract

During the construction process of the port terminal,it is necessary to construct the pile foundation of the sheet pile terminal.The quality of the pile foundation determines the construction quality of subsequent works.With the continuous development of port construction,the quality requirements for wharves are gradually increasing.The traditional sheet pile structure can no longer meet the requirements of large-scale and deep-water wharf structures.Therefore,the steel pipe-sheet composite pile structure has gradually been widely used.This type of combination is still applicable under the complex geological conditions,and has the characteristics of good mechanical properties,relatively simple construction,short construction period and high economic benefits.Taking the Jinjiang Wharf project in Indonesia as an example,the structural characteristics and construction technology are introduced.

关键词

码头施工/桩基/钢管板组合桩/结构特点/施工工艺

Key words

wharf construction/pile foundation/steel pipe and plate composite piles/Structural features/construction technology

分类

交通工程

引用本文复制引用

陈奇..钢管板组合桩结构特点及施工工艺[J].港口航道与近海工程,2024,61(z1):50-53,4.

港口航道与近海工程

1004-9592

访问量0
|
下载量0
段落导航相关论文