Abstract

This article takes the Takoradi Oil and Gas Service Terminal dredging project in Ghana as an example,to illustrate the operation techniques of underwater blasting and hammering for moderately weathered stone under the condition of complex geological terrain and in an operating terminal.It is a typical example of grab dredger used for dredging and excavation,and successfully applying multiple technologies such as blasting and hammering.Another successful case of harbor dredging is provided based on local conditions,which has reference significance for similar projects.

关键词

疏浚/中微风化岩凿岩/中微风化岩水下爆破/运营码头港池疏浚开挖/境外

Key words

dredging/hammering in moderately and slightly weathered rock/underwater blasting for moderately weathered stone/dredging and excavation of operating terminal