煤炭与化工2024,Vol.47Issue(8):36-40,5.DOI:10.19286/j.cnki.cci.2024.08.008
综采三角煤开采连续减架工艺研究
Research on continuous support reduction technology in fully mechanized triangular coal mining
李德军1
作者信息
- 1. 山西煤炭运销集团裕兴煤业有限公司,山西晋城 048000
- 折叠
摘要
Abstract
To address the issues of low recovery efficiency and resource waste of comer coal and triangular coal,this paper focuses on the No.15210 Face of an experimental mine.Theoretical calculations and on-site monitoring were used,the triangular coal recovery process was studied and a continuous reduction recovery plan along with corresponding chute reinforcement support measures was proposed.After field application,the surface displacement and stress distribution of roadway surrounding rock were monitored,and the results showed that the reinforcement support effect of roadway was good.The successful implementation of the continuous support reduction scheme reduced the waste of triangular coal resources and created considerable economic value.关键词
综采工作面/三角煤/连续减架/补强支护Key words
fully mechanized mining face/triangular coal/continuous support reduction/reinforcement support分类
矿山工程引用本文复制引用
李德军..综采三角煤开采连续减架工艺研究[J].煤炭与化工,2024,47(8):36-40,5.