河南水利与南水北调2024,Vol.53Issue(8):42-43,2.
韩江榕江练江水系连通后续优化工程水土保持分析与评价
Analysis and Evaluation on Soil and Water Conservation of the Follow-up Optimization Project of Hanjiang River,Rongjiang River and Lianjiang River Interconnecting System
李思思 1詹锐生1
作者信息
- 1. 广东省水利电力勘测设计研究院有限公司,广东 广州 510635
- 折叠
摘要
Abstract
In order to promote the high quality and ecological civilization construction of water diversion project,the main engineering design of Hanjiang River,Rongjiang River and Lianjiang River interconnecting system is analyzed and optimized from the aspect of soil and water conservation.This paper analyzes and evaluates the site selection,project area,soil and rock balance,construction organization and soil&water conservation engineering in the design of the main engineering on the basis of introduction of the project scale and potential soil erosion influence.The balance between engineering construction,ecological environment and soil&water conservation is considered in the main project design,which meet the requirements of soil&water conservation,and could effectively control soil erosion by taking appropriate supplementary engineering measures,temporary measures and plant measures.关键词
水系连通/引调水工程/水土保持Key words
drainage connectivity/water diversion project/soil and water conservation分类
建筑与水利引用本文复制引用
李思思,詹锐生..韩江榕江练江水系连通后续优化工程水土保持分析与评价[J].河南水利与南水北调,2024,53(8):42-43,2.