碾压混凝土大坝全断面准三级配施工方法

田巧玲 高元博 庞三余 刘杰 王淋钢

河南水利与南水北调2024,Vol.53Issue(8):48-49,2.
河南水利与南水北调2024,Vol.53Issue(8):48-49,2.

碾压混凝土大坝全断面准三级配施工方法

Construction of Full-section Three-graded Concrete of RCC Dam

田巧玲 1高元博 1庞三余 1刘杰 1王淋钢1

作者信息

  • 1. 中国水利水电第十一工程局有限公司,河南 郑州 450001
  • 折叠

摘要

Abstract

Two-graded concrete is normally used in the upstream and downstream for the seepage control of rolled dam,while three-graded concrete is used in the dam body itself.In the construction,,different kind of concrete mignt be mixed in placement in same block,affecting the construction quality.Placement of roller compacted concrete,normal concrete and mortar in the same block will affect construction progress.In the Kafue Gorge Lower Hydropower Station construction,the dam structure design was optimized based on the analysis and study of new concept,technology and processes of RCC design and construction,and quasi three-graded roller compacted concrete(max aggregate size of 63 mm)was used in the dam body,while in the upstream and downstream of the dam the roller compacted conrete was transformed into enrich-vibrated Rcc by adding sllury from the bottom and vibrating.

关键词

碾压混凝土/全断面/准三级配/骨料

Key words

roller compacted concrete/full section/quasi-three-graded concrete/aggregate