河南水利与南水北调2024,Vol.53Issue(8):68-70,3.
水电工程居民避险搬迁安置方案设计
Design of Relocation and Resettlement Scheme for the Inhabitants around Hydropower Project Site
李政勰1
作者信息
- 1. 河南省水利移民事务中心,河南 郑州 450003
- 折叠
摘要
Abstract
Inhabitants relocation could effectively reduce the potential losses caused by geological disasters in hydropower projects construction,and is necessary for protection of ecological environment and promotion of regional development.Based on the practical situation of the key water control project,a comprehensive analysis of the key points of relocation and resettlement plan for the inhabitants around the hydropower project site is made.The results show that the inhabitants relocation plan design should be made based on fully understanding the overall project task and the construction site situation,so as to ensure that the inhabitants relocation and settlement work could be implemented effectively.关键词
水电工程/居民避险搬迁/安置方案Key words
hydropower project/inhabitants relocation/resettlement scheme分类
政治法律引用本文复制引用
李政勰..水电工程居民避险搬迁安置方案设计[J].河南水利与南水北调,2024,53(8):68-70,3.