河南水利与南水北调2024,Vol.53Issue(8):101-102,2.
小浪底北岸灌区PPP项目风险分配与防控措施研究
Research on Risk Allocation and Control Measures of PPP Project in Xiaolangdi North Bank Irrigation Area
张卢笑 1王耀文 2郭硕 3董朝阳1
作者信息
- 1. 河南省海河流域水利事务中心,河南 新乡 453005
- 2. 华北水利水电大学,河南 郑州 450045
- 3. 河南水投小浪底北岸灌区工程有限公司,河南 郑州 450000
- 折叠
摘要
Abstract
In the implementation of PPP project,special attention is paid to the fairness and rationality of risk allocation among the main participants,while the previous allocation model often focuses on one of the parties only,and there is no accurate risk sharing standard,resulting in unsatisfactory results for all parties to bear risks.Based on the PPP project in the North Bank Irrigation Area of Xiaolangdi,this paper puts forward that the risks should be borne by both the government and the private parties,and the risk allocation among the participants through the identification of risk factors,and proposes corresponding risk prevention and risk control measures,which provides a reference for the risk allocation and risk control of water conservancy projects under the PPP model.关键词
水利工程/PPP模式/风险识别/风险分配Key words
water conservancy engineering/PPP mode/risk identification/risk allocation分类
经济学引用本文复制引用
张卢笑,王耀文,郭硕,董朝阳..小浪底北岸灌区PPP项目风险分配与防控措施研究[J].河南水利与南水北调,2024,53(8):101-102,2.