小浪底水库汛前调水调沙模拟与综合效益评估

夏军强 张贤梓依 王增辉 陈翠霞 周祖昊

湖泊科学2024,Vol.36Issue(5):1550-1561,12.
湖泊科学2024,Vol.36Issue(5):1550-1561,12.DOI:10.18307/2024.0544

小浪底水库汛前调水调沙模拟与综合效益评估

Modelling of the flow and sediment regulation processes before flood seasons in the Xiao-langdi Reservoir and evaluation of comprehensive benefits

夏军强 1张贤梓依 1王增辉 2陈翠霞 3周祖昊4

作者信息

  • 1. 武汉大学,水资源工程与调度全国重点实验室,武汉 430072
  • 2. 西北农林科技大学水利与建筑工程学院,杨凌 712100
  • 3. 黄河勘测规划设计研究院有限公司,郑州 450003
  • 4. 中国水利水电科学研究院,流域水循环模拟与调控国家重点实验室,北京 100038
  • 折叠

摘要

Abstract

To improve the comprehensive benefits of the Xiaolangdi Reservoir in gaming among multi-objectives during the flow and sediment regulation processes before flood seasons,an integrated model has been proposed,which can simulate the flow-sediment transport in the reservoir area and quantitatively evaluate the comprehensive benefits of reservoir operation.The integrated model consists of three sub-modules,including:a flow-sediment transport module,which considers the process of turbidity currents and flow exchanges between the mainstream and tributaries;a reservoir regulation module,which serves as a connection between the flow-sediment simulation in the reservoir area and the calculation of channel deformation volume in the Lower Yellow River;a ben-efit evaluation module,which adopts an economic indicator to measure the comprehensive benefits.Flow and sediment regulation e-vents in the Xiaolangdi Reservoir in 2013 and 2014 were used for model calibration and verification,showing that the whole proces-ses of plunging,transport and venting of turbidity current,as well as the outflow and power generation processes,were in good a-greement with the measured data.Key operation parameters were selected based on the practical experience of flow-sediment regula-tion events over the years.Based on the 2014 actual operation process,5 new operation schemes were designed by reducing the connecting water level or decreasing the degree of backwater,and comprehensive benefits of these five operation schemes were as-sessed.Calculation results showed that the changes of connecting water levels and backwater conditions in a reservoir regulation process would have a conflict between sedimentation reduction and water conservancy.By comparing the economic indicators of de-signed operation schemes,the operation scheme with the connecting water level of 222.57 m and less backwater has been suggested for gaining higher comprehensive benefits in the Xiaolangdi Reservoir.

关键词

汛前调水调沙/水库调度/综合效益/数值模拟/小浪底水库

Key words

Flow and sediment regulation/reservoir operation/comprehensive benefits/numerical simulation/Xiaolangdi Reser-voir

引用本文复制引用

夏军强,张贤梓依,王增辉,陈翠霞,周祖昊..小浪底水库汛前调水调沙模拟与综合效益评估[J].湖泊科学,2024,36(5):1550-1561,12.

基金项目

国家自然科学基金项目(U2243238)和国家重点研发计划项目(2023YFC3209304)联合资助. (U2243238)