This paper constructs a model based on the development and layout of four-desert wind power photovoltaic(PV)bases,formulates the timing development strategy and carries out simulation verification.The hierarchical clustering method is used to carry out electrical clustering of the IEEE 30-node system,and the constructed spatial layout model of the four-desert wind power photovoltaic(WPPV)bases is solved using the improved particle swarm algorithm(IPSA),and the results of the timing sequence optimization strategy are analyzed,which suggests that the established spatial layout model of wind power and photovoltaic is relatively accurate,and can simulate the distribution characteristics of the four major desert wind power and photovoltaic,and the simulation conditions during operation are closer to the actual situation,which can provide more accurate design schemes and investment strategies for the construction and development of the four major desert wind power and photovoltaic layouts,timing planning and other issues.关键词
沙漠/风光基地/时序优化/分层聚类/改进粒子群算法Key words
the desert/wind-photovoltaic bases/timing sequence optimization/hierarchical clustering/improved particle swarm optimization分类
动力与电气工程引用本文复制引用
刘会强,李殊瑶,张爱军,慕腾,王秀丽,文福拴..四大沙漠风光基地空间布局及时序优化策略[J].内蒙古电力技术,2024,42(4):48-55,8.基金项目
国家重点研发计划项目"大规模可再生能源基地特高压多端直流输电外送关键技术"(2023YFB2405900) (2023YFB2405900)