内蒙古电力技术2024,Vol.42Issue(4):87-92,6.DOI:10.19929/j.cnki.nmgdljs.2024.0058
高比例新能源接入下内蒙古电网发展结构研究
Research on Development Structure of Inner Mongolia Power Grid Under High Proportion of New Energy Access
摘要
Abstract
In order to achieve safe and stable transmission of new energy electricity,Inner Mongolia Power Grid will build multiple grid-to-grid DC channels to deliver clean energy electricity to other provincial and regional power grids in the future.However,Inner Mongolia Power Grid still faces transient and dynamic stability problems under some DC faults,which needs to be optimized from the planning level for the main grid structure of the Inner Mongolia Power Grid.Based on the analysis of the current network adaptability,this paper compares various technical routes,including asynchronous networking project,internal reinforcement project and external ultra-high voltage extension project,and analyzes the frequency stability,dynamic stability,and short-circuit current issues that may occur in different projects.Finally,this paper innovatively proposes that Inner Mongolia Power Grid and North China Power Grid should adopt asynchronous network or ultra-high voltage AC interconnection network to meet the needs of DC channel access.关键词
沙戈荒新能源基地/电网规划/新能源接入/动态稳定/频率稳定/特高压交流/直流输电Key words
desert-gobi-wasteland new energy base/power grid planning/new energy access/dynamic stability/frequency stability/ultra high voltage AC/DC transmission分类
信息技术与安全科学引用本文复制引用
雷轲,呼斯乐,慕腾,于源,刘石川,郭建华..高比例新能源接入下内蒙古电网发展结构研究[J].内蒙古电力技术,2024,42(4):87-92,6.基金项目
内蒙古电力(集团)有限责任公司规划专题项目"基于最优建设时序的特高压交、直流混合送出型电网规划研究"(2024-24) (集团)