| 注册
首页|期刊导航|能源工程|1030MW机组高压旁路调节阀失效分析及技术对策

1030MW机组高压旁路调节阀失效分析及技术对策

张宇飞

能源工程2024,Vol.44Issue(4):31-35,5.
能源工程2024,Vol.44Issue(4):31-35,5.DOI:10.16189/j.nygc.2024.04.006

1030MW机组高压旁路调节阀失效分析及技术对策

Failure analysis and technical countermeasures of high-side control valve of 1030MW unit

张宇飞1

作者信息

  • 1. 浙江浙能中煤舟山煤电有限责任公司,浙江 舟山 316000
  • 折叠

摘要

Abstract

During the operation of steam turbine of a 1030MW ultra supercritical power plant,the bolts on valve cover of high bypass control valve broke,which reduced the safety of the unit.Through analysis,it is considered that bolt quality and valve structure are the main reasons for the failure of high bypass control valve.In order to avoid personal injury,equipment damage,the unit was unscheduled shutdown due to valve steam leakage and bolt fracture,and improve the unit efficiency,a technical transformation scheme using self-sealing high bypass control valve is proposed by using the original nozzle,actuator,control component and hydraulic oil station.

关键词

高压旁路/调节阀/螺栓/断裂/自密封

Key words

HP bypass/control valve/bolt/fracture/self-sealing