科技创新与应用2024,Vol.14Issue(26):177-180,4.DOI:10.19981/j.CN23-1581/G3.2024.26.039
变电站二次接线施工技术要点
翁其彩1
作者信息
- 1. 福州亿力电力工程有限公司,福州 350000
- 折叠
摘要
Abstract
Secondary wiring is one of the most important in the process of substation construction,which is related to the quality of the whole project and related to the realization of electrical control function of substation.In the process of secondary wiring construction,it covers the correctness of the principle of electrical equipment control circuit,and the details of secondary wiring are related to the quality of the whole project.Therefore,before wiring should be familiar with the drawings,proficient in the standard process,the requirements of each step is the key to ensure quality.This paper focuses on the standard technology of substation secondary wiring construction process,which can be used for reference.关键词
二次接线/标准工艺/施工质量/变电站/电气控制Key words
secondary wiring/standard process/construction quality/substation/electrical control分类
信息技术与安全科学引用本文复制引用
翁其彩..变电站二次接线施工技术要点[J].科技创新与应用,2024,14(26):177-180,4.