变电站二次接线施工技术要点

翁其彩

科技创新与应用2024,Vol.14Issue(26):177-180,4.
科技创新与应用2024,Vol.14Issue(26):177-180,4.DOI:10.19981/j.CN23-1581/G3.2024.26.039

变电站二次接线施工技术要点

翁其彩1

作者信息

  • 1. 福州亿力电力工程有限公司,福州 350000
  • 折叠

摘要

Abstract

Secondary wiring is one of the most important in the process of substation construction,which is related to the quality of the whole project and related to the realization of electrical control function of substation.In the process of secondary wiring construction,it covers the correctness of the principle of electrical equipment control circuit,and the details of secondary wiring are related to the quality of the whole project.Therefore,before wiring should be familiar with the drawings,proficient in the standard process,the requirements of each step is the key to ensure quality.This paper focuses on the standard technology of substation secondary wiring construction process,which can be used for reference.

关键词

二次接线/标准工艺/施工质量/变电站/电气控制

Key words

secondary wiring/standard process/construction quality/substation/electrical control

分类

信息技术与安全科学

引用本文复制引用

翁其彩..变电站二次接线施工技术要点[J].科技创新与应用,2024,14(26):177-180,4.