不良地质条件下顶管始发井逆作法施工技术研究

毛勇 熊亮 罗飞轮

四川水力发电2024,Vol.43Issue(4):4-9,6.
四川水力发电2024,Vol.43Issue(4):4-9,6.

不良地质条件下顶管始发井逆作法施工技术研究

Study on Top-down Construction Technology of Pipe Jacking Starting Well under Bad Geological Conditions

毛勇 1熊亮 1罗飞轮1

作者信息

  • 1. 中国水利水电第五工程局有限公司,四川 成都 610066
  • 折叠

摘要

Abstract

Taking the Diversion Project from the Zhuoer River to the Xiliao River in Inner Mongolia as an exam-ple,this paper expounds the top-down construction technology of the pipe jacking starting well under bad geo-logical conditions,by means of advanced grouting,well point dewatering,monitoring,measuring,and informa-tion feedback,a series of quality and safety problems under bad geological conditions have been solved by exca-vation and support and concrete construction of top-down starting well,it effectively avoids all kinds of risks in the construction of traditional shaft foundation pit,sums up the construction technology and key procedures of top-down construction method under bad geological conditions and control points,and the experience obtained can provide reference for similar projects in the future.

关键词

引绰济辽/不良地质条件/始发井/逆作法/施工技术

Key words

Diversion Project from the Zhuoer River to the Xiliao River in Inner Mongolia/Bad geology/Starting well/Top-down construction method/Construction technology