| 注册
首页|期刊导航|四川水力发电|巴塘水电站大坝堆石料的开采与质量控制

巴塘水电站大坝堆石料的开采与质量控制

曾铁钢

四川水力发电2024,Vol.43Issue(4):13-16,4.
四川水力发电2024,Vol.43Issue(4):13-16,4.

巴塘水电站大坝堆石料的开采与质量控制

Rock-fill Material Mining and Quality Control for the Dam of Batang Hydropower Project

曾铁钢1

作者信息

  • 1. 中国水利水电第五工程局有限公司,四川 成都 610066
  • 折叠

摘要

Abstract

In view of the difficulties in mining rock-fill materials for the dam of the Batang Hydropower Project,a study on the mining and quality control of the dam materials was carried out.According to the blasting min-ing test at the site,the broken rock mass and the cut and developed crack are the main reasons that the rockfill material mining cannot meet the design gradation requirement,under the rock mass condition of the left bank key structure slope of the Batang Hydropower Project,it is difficult to collect the rockfill material that meets the design requirements by adjusting the blasting parameters.Although there are more fine particles and worse gradation in the excavated materials of the left bank project of the Batang Hydropower Project,the physical characteristics of the rockfill materials were obtained through laboratory and field compaction tests,the rock-fill material of the dam was finally selected to excavate the slope of the left bank key building,and the blasting parameters,filling and rolling construction parameters of the rock-fill material were determined to ensure the mining and filling quality of the rock-fill material of the dam,the project investment was saved,and new rock-fill quarrying sites were prevented from damaging the fragile ecological environment of the Tibetan plateau in the upstream of Jinsha River,resulting in better economic and social benefits.

关键词

岩体破碎/坝料开采/爆破试验/颗粒级配/巴塘水电站/质量控制

Key words

Rock fragmentation/Dam material mining/Blasting test/Grain gradation/Batang Hydropower Pro-ject/Quality control

分类

水利科学

引用本文复制引用

曾铁钢..巴塘水电站大坝堆石料的开采与质量控制[J].四川水力发电,2024,43(4):13-16,4.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文