摘要

Abstract

The high-speed railway prefabricated box girder in the winter construction is characterized by high cost,great construction difficulty,difficult temperature control.Combined with the prefabricated box girder winter construction of Lairong Railway Haiyang Beam Field,this paper introduces high-speed railway prefabri-cated box girder winter construction steam equipment,steam technology and operation points,and the steam temperature analysis and summary,and provides useful reference for similar engineering construction.

关键词

莱荣铁路/海阳制梁场/高速铁路/冬期施工/蒸汽养护/温度控制/预制箱梁

Key words

Lairong High-speed Railway/Winter construction/Steam maintenance/Temperature control/Box girder