四川水力发电2024,Vol.43Issue(4):27-31,45,6.
莱荣高速铁路预制箱梁冬期蒸养施工技术研究及温度控制
Study on the Steam Maintenance Construction Technology and Temperature Control of Lairong High-speed Railway Prefabricated Box Girder in Winter
张达志 1任小强 1赵俊松 1任浩 1赵耀1
作者信息
- 1. 中国水利水电第五工程局有限公司,四川 成都 610066
- 折叠
摘要
Abstract
The high-speed railway prefabricated box girder in the winter construction is characterized by high cost,great construction difficulty,difficult temperature control.Combined with the prefabricated box girder winter construction of Lairong Railway Haiyang Beam Field,this paper introduces high-speed railway prefabri-cated box girder winter construction steam equipment,steam technology and operation points,and the steam temperature analysis and summary,and provides useful reference for similar engineering construction.关键词
莱荣铁路/海阳制梁场/高速铁路/冬期施工/蒸汽养护/温度控制/预制箱梁Key words
Lairong High-speed Railway/Winter construction/Steam maintenance/Temperature control/Box girder分类
交通运输引用本文复制引用
张达志,任小强,赵俊松,任浩,赵耀..莱荣高速铁路预制箱梁冬期蒸养施工技术研究及温度控制[J].四川水力发电,2024,43(4):27-31,45,6.