四川水力发电2024,Vol.43Issue(4):79-85,7.
铜街子水电站右岸心墙开槽前后应力变形分析
Stress and Deformation Analysis of the Right Bank Core Wall of Tongjiezi Hydropower Project before and after Slotting
杨庚鑫 1陆嘉斌 1张泽彬 1陈家琦 2马德萍3
作者信息
- 1. 国能大渡河流域水电开发有限公司,四川 成都 610000
- 2. 中国电建集团成都勘测设计研究院有限公司,四川 成都 610072
- 3. 成都市市政工程设计研究院有限公司,四川 成都 610000
- 折叠
摘要
Abstract
In order to restore the ecological connectivity of fish in the lower reaches of Dadu River,Tongjiezi Hydropower Project added a fishway 30 years after its completion.The new fishway is arranged by the right bank slope to excavate the upstream and downstream dam slope,and the reinforced concrete core wall is slotted for the construction of the fishway through the dam.The stress and deformation of the core wall before and af-ter slotting play an important role in the safe operation of Tongjiezi Hydropower Project.In this paper,the slotting of the core wall is taken as the research object,the structural stress analysis and displacement field a-nalysis are carried out by using three-dimensional finite element method,and the general law of structural stress distribution and deformation distribution characteristics are explored.The research results can guide the safety management and control of the core wall slotting construction period,and provide design reference for other similar projects.关键词
心墙开槽/应力变形分析/铜街子水电站Key words
Core wall slotting/Stress deformation analysis/Tongjiezi hydropower Project分类
建筑与水利引用本文复制引用
杨庚鑫,陆嘉斌,张泽彬,陈家琦,马德萍..铜街子水电站右岸心墙开槽前后应力变形分析[J].四川水力发电,2024,43(4):79-85,7.