| 注册
首页|期刊导航|四川水力发电|昌波水电站引水式地下厂房及开关站布置研究

昌波水电站引水式地下厂房及开关站布置研究

文浩 王明

四川水力发电2024,Vol.43Issue(4):101-106,117,7.
四川水力发电2024,Vol.43Issue(4):101-106,117,7.

昌波水电站引水式地下厂房及开关站布置研究

Study on Layout of Diversion Underground Powerhouse and Switch Station of Changbo Hydropower Project

文浩 1王明1

作者信息

  • 1. 中国电建集团贵阳勘测设计研究院有限公司,贵州 贵阳 550081
  • 折叠

摘要

Abstract

Combining with the topography and geology,layout of water conveyance and power generation sys-tem,engineering construction,operation and maintenance of Changbo Hydropower Project,the layout of diver-sion powerhouse and switch station is studied and compared.Finally,it is determined that the diversion power-house is arranged in the ridge about 500m upstream of Moqu Estuary,and the tail underground powerhouse is adopted.The longitudinal axis direction of the powerhouse is N73°W,and the switch station is arranged at the bend of the highway upstream of Moqu Estuary,and the ground switch station is adopted.

关键词

地下厂房/厂房位置和轴线/开关站/方案比较

Key words

Underground powerhouse/Powerhouse location and axis/Switch station/Scheme comparision

分类

建筑与水利

引用本文复制引用

文浩,王明..昌波水电站引水式地下厂房及开关站布置研究[J].四川水力发电,2024,43(4):101-106,117,7.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文