山东煤炭科技2024,Vol.42Issue(8):53-55,64,4.DOI:10.3969/j.issn.1005-2801.2024.08.011
煤巷掘锚一体化机组快速掘进工艺优化
Optimization of Rapid Excavation Technique for Integrated Excavation and Anchoring Machine Set in Coal Roadway
周海军1
作者信息
- 1. 国网能源新疆准东煤电有限公司,新疆 昌吉 831700
- 折叠
摘要
Abstract
In order to improve the efficiency of rapid excavation of the first mining working face coal roadway in the south wing of Zhundong Second Mine in Xinjiang,the factors affecting the stability of surrounding rock such as excavation mechanical parameters,coal seam hardness,structural characteristics and others during the rapid excavation process are analyzed in depth.Through a series of measures such as precise geological evaluation,parameter optimization of excavation machine set,synchronous cutting and support,as well as real-time monitoring and emergency adjustment,etc,the rapid excavation of coal roadways and effective surrounding rock control under complex geological conditions are achieved,providing valuable reference and guidance for the excavation of similar working faces.关键词
煤巷/快速/掘进/工艺Key words
coal roadway/rapid/excavation/technique分类
矿业与冶金引用本文复制引用
周海军..煤巷掘锚一体化机组快速掘进工艺优化[J].山东煤炭科技,2024,42(8):53-55,64,4.