|国家科技期刊平台
首页|期刊导航|陕西水利|兰州新区庙儿沟水库心墙堆石坝沉降计算分析

兰州新区庙儿沟水库心墙堆石坝沉降计算分析OA

Calculation and Analysis of Settlement of Core Rockfill Dam of Miaoergou Reservoir in Lanzhou New District

中文摘要英文摘要

兰州新区庙儿沟水库工程地处兰州新区,为注入式水库,库容比较大,坝体采用壤土心墙土石坝.以Midas GTS NX软件为计算工具,采用邓肯-张(E-B)材料本构模型对坝体进行施工分层模拟以及蓄水期沉降计算.通过计算分析可知,坝体在施工期以及蓄水期的沉降和应力均满足规范要求,表明坝体结构设计合理.

Miaoergou reservoir,located in Lanzhou New District,is an injection reservoir with large storage capacity.The dam body adopts loam core wall earth-rock dam.MidasGTSNX software is used as the calculation tool,and Duncan-Zhang(E-B)material constitutive model is used to simulate the construction stratification of the dam body and calculate the settlement during storage period.Through calculation and analysis,it can be seen that the settlement and stress of the dam during construction period and storage period meet the requirements of the code,indicating that the dam structure design is reasonable.

冯龙龙;吴建东

甘肃省水利水电勘测设计研究院有限责任公司,甘肃 兰州 730000甘肃省水利科学研究院,甘肃兰州 730000

水利科学

水库壤土心墙坝邓肯-张(E-B)沉降应力

Reservoirloam core damDuncan-Chang(E-B)SettlementStress

《陕西水利》 2024 (009)

9-11,15 / 4

甘肃省水利科学试验研究与技术推广项目(2020-20);甘肃省水利科学试验研究与技术推广项目(22GSLK002)

评论