世界有色金属Issue(13):112-114,3.
金属矿山斜井施工中的挑战与解决方案
Challenges and solutions in inclined shaft construction of metal mine
官洺宇1
作者信息
- 1. 辽宁排山楼黄金矿业有限责任公司,辽宁 阜新 123000
- 折叠
摘要
Abstract
Inclined shaft construction in metal mine involves complicated geological conditions and high intensity technical requirements,and faces many challenges,such as rock formation stability,adaptability of construction equipment,environmental protection and safety management.This paper discusses in detail solutions such as improving geological exploration technology,using efficient tunneling equipment,implementing automated construction technology,and adopting intelligent ventilation and real-time monitoring systems,and analyzes the application effects and successful experiences in typical cases.The purpose of this paper is to provide technical guidance and reference for related projects,and promote the efficient and safe development of inclined shaft construction in metal mines.关键词
金属矿山/斜井施工/挑战/解决方案Key words
metal mine/inclined shaft construction/challenge/solution分类
矿业与冶金引用本文复制引用
官洺宇..金属矿山斜井施工中的挑战与解决方案[J].世界有色金属,2024,(13):112-114,3.