| 注册
首页|期刊导航|中国电机工程学报|基于仿射可调鲁棒的非预期全场景可行机组组合

基于仿射可调鲁棒的非预期全场景可行机组组合

肖杨 丁涛 黄海煜 张碧元 熊玮 张彦涛

中国电机工程学报2024,Vol.44Issue(16):6280-6293,14.
中国电机工程学报2024,Vol.44Issue(16):6280-6293,14.DOI:10.13334/j.0258-8013.pcsee.232707

基于仿射可调鲁棒的非预期全场景可行机组组合

Non-anticipative All-scenario-feasible Unit Commitment Based on Affinely Adjustable Robust Model

肖杨 1丁涛 1黄海煜 2张碧元 1熊玮 2张彦涛3

作者信息

  • 1. 西安交通大学电气工程学院,陕西省西安市 710049
  • 2. 国家电网有限公司华中分部,湖北省武汉市 430077
  • 3. 国网电力科学研究院有限公司,江苏省 南京市 211106
  • 折叠

摘要

Abstract

Non-anticipativity is a critical principle in power dispatching,ensuring that uncertain future parameters do not affect current decisions.All-scenario feasibility refers to the ultimate objective in power dispatching,where every possible realization of uncertain parameters has a corresponding feasible decision.These become vital in power dispatching,especially with integrating renewable energy sources introducing uncertainties.Thus,this paper explores the mechanisms of non-anticipativity and all-scenario feasibility,constructing non-anticipativity constraints and a finite scenario set that satisfies all-scenario feasibility.Based on them,this paper establishes a scenario-based all-scenario feasible unit commitment model with non-anticipativity to provide unit commitment solutions that satisfy all-scenario feasibility.Further,recognizing the computational challenges posed by the above model,this paper transforms the model using affine transformations and robust equivalent constraints.It introduces an affine-adjustable robust all-scenario feasible unit commitment model with non-anticipativity in decision-making.This model reduces the computational complexity and demonstrates advantages in solving efficiency.Finally,the paper conducts case studies using a modified IEEE-118 test system.These case studies thoroughly examine the importance of non-anticipativity in decision-making and the necessity of decisions fulfilling all-scenario feasibility in power dispatching,then evaluate the efficiency of the proposed affine-adjustable robust all-scenario feasible unit commitment model with non-anticipativity in the decision-making process.

关键词

非预期性/全场景可行性/机组组合/仿射变换/仿射可调鲁棒优化

Key words

non-anticipativity/all-scenario feasibility/unit commitment/affine transformation/affine-adjustable robust optimization

分类

信息技术与安全科学

引用本文复制引用

肖杨,丁涛,黄海煜,张碧元,熊玮,张彦涛..基于仿射可调鲁棒的非预期全场景可行机组组合[J].中国电机工程学报,2024,44(16):6280-6293,14.

基金项目

国家电网有限公司科技项目(5108-202304065A-1-1-ZN).Science and Technology Project of State Grid Corporation of China(5108-202304065A-1-1-ZN). (5108-202304065A-1-1-ZN)

中国电机工程学报

OA北大核心CSTPCD

0258-8013

访问量6
|
下载量0
段落导航相关论文