超大直径泥水平衡盾构隧道施工通风计算及设备选型研究

吴帝萱

江西建材Issue(6):157-159,3.
江西建材Issue(6):157-159,3.

超大直径泥水平衡盾构隧道施工通风计算及设备选型研究

Study on Construction Ventilation Calculation and Equipment Selection of Super-Large Diameter Slurry Balance Shield Tunnel

吴帝萱1

作者信息

  • 1. 中铁十四局集团大盾构工程有限公司,江苏 南京 211899
  • 折叠

摘要

Abstract

Based on the Jinan Yellow River shield tunnel project,this paper calculates the minimum required air volume under various working conditions of large-diameter slurry balance shield tunnel according to relevant specifications and health standards,and designs the ventilation mode and equipment selection according to the maximum required air volume and air pressure.The calculation results show that the required air volume calculated according to the dust exhaust wind speed is the maximum required air volume of the shield tunnel,the size is 2 730 m3/min,and the maximum air pressure is 4 350 Pa.Using a single air duct with a diameter of 2 m can meet the on-site ventilation requirements.The re-search results can provide some reference value for similar projects.

关键词

隧道工程/泥水平衡盾构/通风计算/设备选型

Key words

Tunnel engineering/Slurry balance shield/Ventilation calculation/Equipment selection