首页|期刊导航|水力发电|利用已建水库建设抽水蓄能电站装机容量选择研究——以泸西抽水蓄能电站开发为例

利用已建水库建设抽水蓄能电站装机容量选择研究——以泸西抽水蓄能电站开发为例

万文功 卢鹏 周林 向军

水力发电2024,Vol.50Issue(10):7-12,6.
水力发电2024,Vol.50Issue(10):7-12,6.

利用已建水库建设抽水蓄能电站装机容量选择研究——以泸西抽水蓄能电站开发为例

Study on the Installed Capacity Selection of Pumped-storage Using Existing Reservoirs:Taking the Development of Luxi Pumped-storage Power Station as an Example

万文功 1卢鹏 2周林 2向军2

作者信息

  • 1. 水电水利规划设计总院,北京 100120
  • 2. 中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650051
  • 折叠

摘要

Abstract

Under the conditions that the power system space is sufficient and the project is technically and economically feasible,making full use of existing reservoir to increase the installed capacity of pumped-storage power station can effectively reduce the overall investment of power system and save land resources and ecological space,but it also faces some key technology and interest coordination problems that need to be paid attention to.Taking Luxi Pumped-storage Power Station as the research object,this paper puts forward the demonstration idea and key influencing factors of the installed capacity selection of pumped-storage power station by using existing reservoir with good topographic and geological conditions,and summarizes the relevant key design points and suggestions.The research results can be used as reference for the design of other similar engineering.

关键词

已建水库/装机容量选择/设计要点/泸西抽水蓄能电站

Key words

existing reservoir/installed capacity selection/key design points/Luxi Pumped-storage Power Station

分类

建筑与水利

引用本文复制引用

万文功,卢鹏,周林,向军..利用已建水库建设抽水蓄能电站装机容量选择研究——以泸西抽水蓄能电站开发为例[J].水力发电,2024,50(10):7-12,6.