建设新型电力系统目标下的湖南省中长期电源优化配置研究

罗茜 卢有麟 王俊钗

水力发电2024,Vol.50Issue(10):13-18,6.
水力发电2024,Vol.50Issue(10):13-18,6.

建设新型电力系统目标下的湖南省中长期电源优化配置研究

Research on the Optimal Allocation of Medium and Long-term Power Supply in Hunan Province under the Goal of Building a New Power System

罗茜 1卢有麟 1王俊钗1

作者信息

  • 1. 中国电建集团中南勘测设计研究院有限公司,湖南 长沙 410014
  • 折叠

摘要

Abstract

In the context of accelerating the construction of a new power system and helping the planning and construction of a new energy system,the power supply structure of Hunan Province is gradually changing from"Hydro and thermal power coordinating"to a new pattern of new energy as the main element of electricity.Considering the randomness and volatility of new energy power generation,the optimization and reconstruction of the energy structure of Hunan power grid and the further development of regulating power supply are very important for the safe operation and the clean development of power system.In this paper,the new power system operation simulation model is used,and the economic model of power supply expansion optimization is established by comprehensively considering the construction and operation cost of power supply expansion,the new energy consumption and other factors.Taking Hunan power grid as the model application example,the allocation of long-term power resources in the power system is analyzed in depth,and the recommended scheme for the optimal allocation of long-term power supply in the system is clarified through technical and economic comparison.

关键词

新型电力系统/电力系统运行模拟/模拟模型/电源扩展优化经济模型/湖南省

Key words

new power system/power system operation simulation/simulation model/power expansion optimization economic model/Hunan Province