输电线路工程不同类型塔基边坡径流产沙特征

王静怡 吴霜 翟晓萌 程曦 吴智洋 李小朴

水土保持研究2024,Vol.31Issue(6):29-36,8.
水土保持研究2024,Vol.31Issue(6):29-36,8.DOI:10.13869/j.cnki.rswc.2024.06.042

输电线路工程不同类型塔基边坡径流产沙特征

Characteristics of Runoff and Sediment Production Process in Slopes of Different Texture Tower Foundations in Power Transmission Line Engineering

王静怡 1吴霜 1翟晓萌 1程曦 1吴智洋 2李小朴2

作者信息

  • 1. 国网江苏省电力有限公司经济技术研究院,南京 210008
  • 2. 中国电力工程顾问集团华东电力设计院有限公司,上海 200063
  • 折叠

摘要

Abstract

[Objective]The aims of this study are to explore the characteristics of soil and water loss on the foundation slope of power transmission line engineering,and to provide theoretical basis for soil and water loss control of power transmission line engineering.[Methods]The power transmission line engineering in loess hilly area was taken as the research object.The characteristics of soil and water loss in each erosion unit of the transmission line engineering and the characteristics of runoff and sediment production in different types of tower foundation slopes were analyzed through field investigation and simulated rainfall test.[Results](1)The proportion of soil and water loss of each erosion unit in the total soil and water loss of the project is shown in the order:tower foundation area>construction road>stretch field area>spanning construction site.The soil and water loss in the tower foundation area accounts for more than 60%of the total soil and water loss in the project.(2)Compared with the original ground,the construction of the tower foundation slope increases the surface runoff.The runoff rate of each type of tower foundation slope is 1.8 to 8.7 times of that in the original ground.Compared with more soil tower foundation slope,more stone tower foundation slope can reduce 4%to 35%of runoff rate.Planting grass can reduce runoff rate by 20%to 48%.(3)Compared with the original ground,the sediment content increases by 0.5 to 345 times after the construction of the tower foundation slope,and the more soil tower foundation slope increases the most.The more stone tower foundation slope can reduce the sediment content of runoff by 39%~92%.The grass tower foundation slope can reduce the sediment content by 83%~98%.[Conclusion]In the process of power transmission line construction,the tower foundation area is the biggest erosion unit of soil and water loss.Planting grass cover can significantly reduce the sediment yield of the tower foundation area.Vegetation restoration should be carried out in time after the construction of the tower foundation area.

关键词

含沙量/径流率/水土流失/塔基边坡/输电线路工程

Key words

sediment content/runoff rate/soil erosion/tower foundation slope/power transmission line engineering

分类

农业科技

引用本文复制引用

王静怡,吴霜,翟晓萌,程曦,吴智洋,李小朴..输电线路工程不同类型塔基边坡径流产沙特征[J].水土保持研究,2024,31(6):29-36,8.

基金项目

国网江苏省电力有限公司科技项目"输变电工程水土保持智能管控系统研究"(J2021072) (J2021072)

水土保持研究

OA北大核心CSTPCD

1005-3409

访问量0
|
下载量0
段落导航相关论文