Abstract
The Shuibuya Dam in Qingjiang River is the world's highest concrete faced rockfill dam.Its spillway was designed and verified based on the 1 000-year flood standard.The consistency of the shape of the spillway with the design is related to the relationship between flood flow velocity and flow pattern changes.If the shape deviation is too large,there may be cavitation,affecting the safe and normal operation of the hydropower.This paper introduced the re-measurement of the main dimensions of the Shuibuya Dam spillway and evaluated the construction deviation.The results show that the construction deviation of the Shuibuya Dam spillway is relatively small,meeting the design requirements,and it will not affect the normal operation of the hydropower station.关键词
水布垭水电站/溢洪道/体形复测/偏差/分析评价Key words
Shuibuya Dam/spillway/shape re-measurement/deviation/analysis and evaluation分类
天文与地球科学引用本文复制引用
刘涛,庞正芳,庞正辉,邓廷银,李金涛,吴小串..水布垭水电站溢洪道体形复测实践及偏差分析[J].北京测绘,2024,38(9):1364-1369,6.